Project Description

Case Study: The works involved refurbishment of the existing first floor bar area to create a new larger bar and circulation area for the Circle level of the Theatre. One of the existing bars was re-positioned and the other bar was refurbished to the new design. Existing glazed partitions were removed which previously formed two separate bars to create a single space forĀ all Theatre guests to frequent. The area had new floor, wall and ceiling finishes together with new lighting, air conditioning etc.